S 3743119th CongressIn Committee

A bill to direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.

Standard Summary
Balanced plain-English summary

This bill directs the Secretary of the Interior, acting through the Commissioner of Reclamation, to conduct a feasibility study on a selective water withdrawal system at Glen Canyon Dam. The study would examine how to optimize hydropower generation when releasing cold water while preventing invasive species from being entrained, and it would require consultation with the Secretary of Energy and Colorado River Storage Project power contractors. If the Secretary finds an alternative feasible and the power contractors concur, construction could begin, with a study deadline of 18 months and federally funded, nonreimbursable costs.

Key Points

  • 1Requires a feasibility study and hydrological modeling for a selective water withdrawal system at Glen Canyon Dam.
  • 2Aims to optimize hydropower generation during cold-water releases while preventing invasive species entrainment.
  • 3Requires consultation with the Secretary of Energy and Colorado River Storage Project power contractors.
  • 4Allows construction to begin only if the Secretary finds the alternative feasible and contractors concur.
  • 5Sets an 18-month study deadline and makes federal funding nonreimbursable.

Impact Areas

Colorado River Basin water operationsGlen Canyon Dam hydropower generationBureau of ReclamationColorado River Storage Project power contractorsInvasive species managementWestern water and energy stakeholders
Generated by deepseek/deepseek-v4.1-flash-1017Nov 18, 2026