This bill would bring the Electric Reliability Council of Texas under broader Federal Power Act and FERC jurisdiction and require new interregional transmission capacity between ERCOT and neighboring grid regions, with reliability standards, planning deadlines, grid-enhancing technology priorities, environmental review, increased transmission financing authority, and a study of interconnection benefits with Mexico.
Key Points
- 1Repeals ERCOT exemptions and expands FERC jurisdiction over certain ERCOT transmission and reliability matters
- 2Requires reliability standards for minimum total transfer capability between ERCOT and SPP, MISO, and the Western Interconnection
- 3Requires joint plans to site and construct or modify transmission facilities by January 1, 2035
- 4Prioritizes grid-enhancing technologies, existing rights-of-way, degraded land, renewable energy access, community outreach, and registered apprenticeships with prevailing wages
- 5Increases Transmission Facilitation Program borrowing authority from $2.5 billion to $13.5 billion and requires a study on interconnection with Mexico