REWIRE Act
The REWIRE Act amends the Federal Power Act to speed up electric grid capacity expansion by creating a categorical exclusion from National Environmental Policy Act review for reconductoring and related upgrades within existing rights-of-way or on previously disturbed land. It directs FERC to issue rules improving the return on equity for investments in advanced transmission conductors, adds these technologies to state energy conservation program eligibility, and tasks the Department of Energy and National Laboratories with probabilistic grid modeling and regional collaboratives with universities. It also requires DOE to publish an application guide, provide technical assistance, and maintain a clearinghouse of completed reconductoring and grid-enhancing technology projects.
Key Points
- 1Establishes a NEPA categorical exclusion for reconductoring and grid upgrades inside existing rights-of-way or previously disturbed land.
- 2Directs FERC to adopt rules improving return on equity for advanced transmission conductor investments while protecting consumers.
- 3Creates a National Laboratory program for probabilistic transmission planning and resource adequacy modeling with regional university collaboratives.
- 4Requires DOE to issue an application guide, offer technical assistance, and run a clearinghouse on advanced conductors and grid-enhancing technologies.
- 5Adds reconductoring and grid-enhancing technologies to eligible state energy program activities.